United States › Grid › Interconnection queues › California

GEOTHERMAL · CAISO

Binkley Power Project

Binkley Power Project is a 50.0 MW geothermal request withdrawn in the CAISO interconnection queue, in Lake County, California, connecting to PGAE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2008 (completed)
  2. Withdrawn / abandonedNov 2008 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
441
Grid region
CAISO (California)
Utility / transmission owner
PGAE
Connection point (POI)
Geyers 17- Fulton #2 230kV line
Location
Lake County, California
Technology
Geothermal: 50.0 MW
Total requested
50.0 MW
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
30 May 2008
Proposed online date
July 2012
Withdrawn
November 2008

Location

Marker shows the centre of Lake County; the queue data does not give exact sites.

Power plants in California · Transmission lines in California

Other requests in Lake County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem