Walker Ridge

Walker Ridge is a 145 MW onshore wind request withdrawn in the CAISO interconnection queue, in Lake County, California, connecting to PGAE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2016 (completed)
  2. Withdrawn / abandonedSep 2022 (project stopped here)
  3. ConsentedDec 2018 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1284
Grid region
CAISO (California)
Utility / transmission owner
PGAE
Connection point (POI)
Cortina-Mendocino and Cortina-Eagle Rock 115kV Lines
Location
Lake County, California
Technology
Wind: 145 MW
Total requested
145 MW
Service type
Network resource (NRIS)
Study phase
Executed
Queue status
Withdrawn
Entered queue
2 May 2016
Agreement signed
7 December 2018
Proposed online date
December 2026
Withdrawn
September 2022

Location

Marker shows the centre of Lake County; the queue data does not give exact sites.

Power plants in California Β· Transmission lines in California

Other requests in Lake County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem