BATTERY STORAGE · WEST

Battery storage project GI-2023-178, Imperial County

Battery storage project GI-2023-178, Imperial County is a 75.0 MW battery storage request in interconnection study in the West interconnection queue, in Imperial County, California, connecting to Imperial Irrigation District.

Queue statusIn planning
  1. PlanningQueued Jun 2023 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Sep 2025 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
GI-2023-178
Grid region
West (non-ISO utilities)
Utility / transmission owner
Imperial Irrigation District
Connection point (POI)
92kV K line
Location
Imperial County, California
Technology
Battery: 75.0 MW
Total requested
75.0 MW
Study phase
Cluster Study
Queue status
Active
Entered queue
29 June 2023
Proposed online date
September 2025

Location

Marker shows the centre of Imperial County; the queue data does not give exact sites.

Power plants in California · Transmission lines in California

Other requests in Imperial County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem