United States › Grid › Interconnection queues
OCTARY USA · INTERCONNECTION QUEUESWithdrawn queue requests in ERCOT (Texas) — page 7
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| RE Maplewood 2c Solar Solar · Recurrent Energy |
250 MW | Withdrawn / abandoned |
| Blue Summit 2 Onshore wind · Nextera |
250 MW | Withdrawn / abandoned |
| Rockhound Solar Solar · Rockhound Solar 1, LLC |
250 MW | Withdrawn / abandoned |
| Grandview 4 W Onshore wind · Eon |
250 MW | Withdrawn / abandoned |
| Grandview 6 W Onshore wind · Eon |
250 MW | Withdrawn / abandoned |
| King Cabbage Solar Solar · ACE DevCo NC, LLC |
250 MW | Withdrawn / abandoned |
| Gunsight Mountain II Onshore wind · Invenergy |
250 MW | Withdrawn / abandoned |
| Langer Solar Solar · Langer Solar LLC |
250 MW | Withdrawn / abandoned |
| Water Valley Divide Renewable Gen Center Onshore wind · Flying Cloud, LLC |
249 MW | Withdrawn / abandoned |
| Salt Fork Wind Farm ph 2 Onshore wind · Chermac Energy Corporation |
249 MW | Withdrawn / abandoned |
| Highwire Solar Solar · Cypress Creek Renewables |
249 MW | Withdrawn / abandoned |
| Rolling Oak 1 Onshore wind · Airtricity, Inc |
249 MW | Withdrawn / abandoned |
| Tom Green County Wind Energy Project Onshore wind · Airtricity, Inc |
249 MW | Withdrawn / abandoned |
| Mesquite Creek Onshore wind · BNB Renewable Energy, LLC |
249 MW | Withdrawn / abandoned |
| Buffalo Gap 5 Onshore wind · AES SeaWest |
249 MW | Withdrawn / abandoned |
| Chapman Ranch Wind 345 Phase II Onshore wind · Element Markets |
249 MW | Withdrawn / abandoned |
| Panhandle Wind 3 Onshore wind · PATTERN PANHANDLE WIND 3 LLC |
248 MW | Withdrawn / abandoned |
| Anacacho Mountain Wind Onshore wind · Sustainable Energy Strategies, Inc. |
248 MW | Withdrawn / abandoned |
| Wharton Wind Onshore wind · Apex Clean |
248 MW | Withdrawn / abandoned |
| Greenwich/Happy Whiteface Onshore wind · Pace Global Energy Svcs |
242 MW | Withdrawn / abandoned |
| Knickerbocker Solar SLF Solar · Knickerbocker Solar LLC |
241 MW | Withdrawn / abandoned |
| Lunis Creek Solar 2 Solar · Lunis Creek Solar Project, LLC |
240 MW | Withdrawn / abandoned |
| Notrees-2 Onshore wind · Tierra Energy, LLC |
240 MW | Withdrawn / abandoned |
| Texas Clean C Coal · Summit Energy |
240 MW | Withdrawn / abandoned |
| Prairie Switch PV1 SLF Solar · FRESH AIR ENERGY II, LLC |
239 MW | Withdrawn / abandoned |
| Buenos Aires 2 W Onshore wind · Terra-Gen |
237 MW | Withdrawn / abandoned |
| La Joya II Wind Onshore wind · Terra-Gen |
237 MW | Withdrawn / abandoned |
| La Joya I Wind Onshore wind · Terra-Gen |
237 MW | Withdrawn / abandoned |
| BRP Pular BESS Battery storage · BRP Pular BESS LLC |
233 MW | Withdrawn / abandoned |
| Holly Branch Solar Solar · Holly Branch Solar, LLC |
231 MW | Withdrawn / abandoned |
| Smart Wind Ranch Onshore wind · Spinning Star Energy LLC |
230 MW | Withdrawn / abandoned |
| Nueces County Wind Onshore wind · Gamesa Energia Southwest |
230 MW | Withdrawn / abandoned |
| Sinton Wind Onshore wind · Gamesa Energia Southwest |
230 MW | Withdrawn / abandoned |
| SPC Nacogdoches Gas · Southern Power Company |
229 MW | Withdrawn / abandoned |
| Mercedes II BESS Battery storage · SMT Mercedes II, LLC |
228 MW | Withdrawn / abandoned |
| PowerVault BESS Other · SMT Dallas V, LLC |
228 MW | Withdrawn / abandoned |
| Coyote Run Windfarm Onshore wind · FPL Energy, LLC |
225 MW | Withdrawn / abandoned |
| Oxbow Solar Solar · ENGIE Long Draw Solar 2 LLC |
225 MW | Withdrawn / abandoned |
| Bordas Wind Farm Onshore wind · Texas Land Partners |
225 MW | Withdrawn / abandoned |
| Buenos Aires 1 Wind Onshore wind · Terra-Gen |
223 MW | Withdrawn / abandoned |
| Longfellow Ranch Partners Project Ph 2 Onshore wind · Riata Management, LLC |
220 MW | Withdrawn / abandoned |
| Mariah Del Sur Onshore wind · Mariah Acquisition |
218 MW | Withdrawn / abandoned |
| Trevino Solar Solar · S Power |
216 MW | Withdrawn / abandoned |
| Neal Solar II Solar · Neal Solar, LLC |
214 MW | Withdrawn / abandoned |
| Aquamarine BESS Battery storage · ME USA Project I LLC |
214 MW | Withdrawn / abandoned |
| Lunis Creek Solar 3 Solar · Lunis Creek Solar Project, LLC |
212 MW | Withdrawn / abandoned |
| Shorthorn Wind Onshore wind · Nextera |
211 MW | Withdrawn / abandoned |
| Huckabay Windfarm Onshore wind · FPL Energy, LLC |
210 MW | Withdrawn / abandoned |
| Point Rider Solar Solar · Point Rider Solar Project, LLC |
210 MW | Withdrawn / abandoned |
| Peeler Solar Solar · Peeler Solar, LLC |
210 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- West (non-ISO utilities)5,277 · 949.5 GW
- PJM (Mid-Atlantic, Midwest)5,226 · 638.1 GW
- MISO (Midcontinent)3,261 · 621.9 GW
- CAISO (California)2,186 · 619.9 GW
- Southeast (non-ISO utilities)2,738 · 603.3 GW
- SPP (Southwest Power Pool)1,846 · 382.9 GW
- NYISO (New York)1,531 · 324.1 GW
- ERCOT (Texas)1,158 · 262.0 GW
- ISO-NE (New England)982 · 118.1 GW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)