United States β€Ί Grid β€Ί Interconnection queues

ONSHORE WIND Β· ERCOT

Mesquite Creek

Mesquite Creek is a 249 MW onshore wind request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jul 2008 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
10INR0056
Grid region
ERCOT (Texas)
Developer
BNB Renewable Energy, LLC
Technology
Wind: 249 MW
Total requested
249 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
10 July 2008
Proposed online date
December 2050

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem