πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues

SOLAR Β· ERCOT

King Cabbage Solar

King Cabbage Solar is a 250 MW solar request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Feb 2025 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
28INR0283
Grid region
ERCOT (Texas)
Developer
ACE DevCo NC, LLC
Connection point (POI)
Tap 138-kV #8215 Hindes - #8212 Dilley Switch
Technology
Solar: 250 MW
Total requested
250 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
25 February 2025
Proposed online date
May 2028

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem