United States β€Ί Grid β€Ί Interconnection queues

COAL Β· ERCOT

Texas Clean C

Texas Clean C is a 240 MW coal request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2010 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. ConsentedSep 2012 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
13INR0023
Grid region
ERCOT (Texas)
Developer
Summit Energy
Connection point (POI)
tap 138kV 1009 Yucca Dr - 1019 Moss
Technology
Coal: 240 MW
Total requested
240 MW
Study phase
IA
Queue status
Withdrawn
Entered queue
31 March 2010
Agreement signed
4 September 2012
Proposed online date
December 2021

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem