United States β€Ί Grid β€Ί Interconnection queues β€Ί Texas

SOLAR Β· ERCOT

Point Rider Solar

Point Rider Solar is a 210 MW solar request withdrawn in the ERCOT interconnection queue, in Navarro County, Texas.

Queue statusWithdrawn / abandoned
  1. Planning (completed)
  2. Withdrawn / abandonedSep 2021 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
22INR0406
Grid region
ERCOT (Texas)
Developer
Point Rider Solar Project, LLC
Connection point (POI)
tap 138kV 3467 Powell - 3472 Briar Creek
Location
Navarro County, Texas
Technology
Solar: 210 MW
Total requested
210 MW
Study phase
FIS & SS Incomplete
Queue status
Withdrawn
Proposed online date
July 2023
Withdrawn
September 2021

Location

Marker shows the centre of Navarro County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Navarro County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem