United States β€Ί Grid β€Ί Interconnection queues

ONSHORE WIND Β· ERCOT

Coyote Run Windfarm

Coyote Run Windfarm is a 225 MW onshore wind request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2006 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. ConsentedMar 2009 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
07INR0036
Grid region
ERCOT (Texas)
Developer
FPL Energy, LLC
Technology
Wind: 225 MW
Total requested
225 MW
Study phase
IA and FIS Pending
Queue status
Withdrawn
Entered queue
14 March 2006
Agreement signed
21 March 2009
Proposed online date
December 2050

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem