United States βΊ Grid βΊ Interconnection queues
ONSHORE WIND Β· ERCOTCoyote Run Windfarm
Coyote Run Windfarm is a 225 MW onshore wind request withdrawn in the ERCOT interconnection queue.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2006 (completed)
- Withdrawn / abandoned (project stopped here)
- ConsentedMar 2009 (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 07INR0036
- Grid region
- ERCOT (Texas)
- Developer
- FPL Energy, LLC
- Technology
- Wind: 225 MW
- Total requested
- 225 MW
- Study phase
- IA and FIS Pending
- Queue status
- Withdrawn
- Entered queue
- 14 March 2006
- Agreement signed
- 21 March 2009
- Proposed online date
- December 2050
Location
No county location in the queue data.
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem