ONSHORE WIND Β· ERCOT

Sinton Wind

Sinton Wind is a 230 MW onshore wind request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jun 2004 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
06INR0015
Grid region
ERCOT (Texas)
Developer
Gamesa Energia Southwest
Technology
Wind: 230 MW
Total requested
230 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
10 June 2004
Proposed online date
December 2050

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem