United States βΊ Grid βΊ Interconnection queues
SOLAR Β· ERCOTKnickerbocker Solar SLF
Knickerbocker Solar SLF is a 241 MW solar request withdrawn in the ERCOT interconnection queue.
Queue statusWithdrawn / abandoned
- PlanningQueued Jan 2019 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 20INR0235
- Grid region
- ERCOT (Texas)
- Developer
- Knickerbocker Solar LLC
- Connection point (POI)
- Tap 345kV 76003 Big Hill - 76009 Twin Buttes
- Technology
- Solar: 241 MW
- Total requested
- 241 MW
- Study phase
- FIS
- Queue status
- Withdrawn
- Entered queue
- 7 January 2019
- Proposed online date
- June 2027
Location
No county location in the queue data.
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem