United States › Grid › Interconnection queues › New Hampshire
OCTARY USA · INTERCONNECTION QUEUESWithdrawn queue requests in New Hampshire — page 2
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Solar Solar |
20.0 MW | Withdrawn / abandoned |
| Claremont Solar Solar |
20.0 MW | Withdrawn / abandoned |
| Biomass Other |
20.0 MW | Withdrawn / abandoned |
| Solar Solar |
20.0 MW | Withdrawn / abandoned |
| Biomass Project Other |
20.0 MW | Withdrawn / abandoned |
| Solar Solar |
20.0 MW | Withdrawn / abandoned |
| Solar Solar |
20.0 MW | Withdrawn / abandoned |
| Solar Solar |
20.0 MW | Withdrawn / abandoned |
| Tilton Heights Energy Center Solar |
19.9 MW | Withdrawn / abandoned |
| Solar Solar |
19.8 MW | Withdrawn / abandoned |
| Wind Onshore wind |
18.0 MW | Withdrawn / abandoned |
| Wind Onshore wind |
18.0 MW | Withdrawn / abandoned |
| Pembroke Solar Solar |
17.5 MW | Withdrawn / abandoned |
| Wind Onshore wind |
16.1 MW | Withdrawn / abandoned |
| Solar Solar |
16.0 MW | Withdrawn / abandoned |
| Nellie Solar Solar |
15.0 MW | Withdrawn / abandoned |
| Solar Solar |
15.0 MW | Withdrawn / abandoned |
| Solar Solar |
14.0 MW | Withdrawn / abandoned |
| Solar Solar |
10.0 MW | Withdrawn / abandoned |
| Solar Solar |
10.0 MW | Withdrawn / abandoned |
| Solar addition Solar |
10.0 MW | Withdrawn / abandoned |
| Solar Solar |
10.0 MW | Withdrawn / abandoned |
| EE Lost Nation Group DG Study Solar |
10.0 MW | Withdrawn / abandoned |
| Solar Solar |
10.0 MW | Withdrawn / abandoned |
| Solar Solar |
10.0 MW | Withdrawn / abandoned |
| CHP Gas |
8.0 MW | Withdrawn / abandoned |
| Landfill Gas Other |
6.3 MW | Withdrawn / abandoned |
| Wind Onshore wind |
2.7 MW | Withdrawn / abandoned |
| Distribution Wind Alternative Onshore wind |
2.0 MW | Withdrawn / abandoned |
| Battery Addition Other |
1.5 MW | Withdrawn / abandoned |
| Landfill Gas Other |
0.8 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)