ONSHORE WIND Β· ISO-NE

Wind

Wind is a 18.0 MW onshore wind request withdrawn in the ISO-NE interconnection queue, in Coos County, New Hampshire.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2013 (completed)
  2. Withdrawn / abandonedJul 2013 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
416
Grid region
ISO-NE (New England)
Connection point (POI)
Pontook Hydro
Location
Coos County, New Hampshire
Technology
Wind: 18.0 MW
Total requested
18.0 MW
Service type
Network resource (NRIS)
Queue status
Withdrawn
Entered queue
23 April 2013
Proposed online date
April 2017
Withdrawn
July 2013

Location

Marker shows the centre of Coos County; the queue data does not give exact sites.

Power plants in New Hampshire Β· Transmission lines in New Hampshire

Other requests in Coos County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem