United States β€Ί Grid β€Ί Interconnection queues β€Ί New Hampshire

OTHER Β· ISO-NE

Landfill Gas

Landfill Gas is a 6.3 MW other request withdrawn in the ISO-NE interconnection queue, in Coos County, New Hampshire.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2007 (completed)
  2. Withdrawn / abandonedJul 2009 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
203
Grid region
ISO-NE (New England)
Connection point (POI)
34.5 kV feeder from Littleton
Location
Coos County, New Hampshire
Technology
Other: 6.3 MW
Total requested
6.3 MW
Service type
Other
Queue status
Withdrawn
Entered queue
20 March 2007
Proposed online date
December 2008
Withdrawn
July 2009

Location

Marker shows the centre of Coos County; the queue data does not give exact sites.

Power plants in New Hampshire Β· Transmission lines in New Hampshire

Other requests in Coos County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem