United States βΊ Grid βΊ Interconnection queues βΊ New Hampshire
ONSHORE WIND Β· ISO-NEWind
Wind is a 2.7 MW onshore wind request withdrawn in the ISO-NE interconnection queue, in Coos County, New Hampshire.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2012 (completed)
- Withdrawn / abandonedJul 2012 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 392
- Grid region
- ISO-NE (New England)
- Connection point (POI)
- PSNH 12.47 kV
- Location
- Coos County, New Hampshire
- Technology
- Wind: 2.7 MW
- Total requested
- 2.7 MW
- Service type
- Network resource (NRIS)
- Queue status
- Withdrawn
- Entered queue
- 28 March 2012
- Proposed online date
- October 2012
- Withdrawn
- July 2012
Location
Marker shows the centre of Coos County; the queue data does not give exact sites.
Power plants in New Hampshire Β· Transmission lines in New Hampshire
Other requests in Coos County
- Granite Reliable PowerOnshore wind Β· 94.5 MW Β· built
- Burgess BioPowerOther Β· 58.7 MW Β· built
- GLHA James River/Fraser Paper7Hydro Β· 25.0 MW Β· built
- Berlin Energy Uprate and Battery AdditionOther Β· 15.0 MW Β· built
- Burgess BioPower IncreaseOther Β· 9.0 MW Β· built
- Jericho WindOnshore wind Β· 8.6 MW Β· built
- Jericho Wind expansionOnshore wind Β· 3.5 MW Β· built
- WindOnshore wind Β· 180 MW Β· withdrawn
- WindOnshore wind Β· 146 MW Β· withdrawn
- Solar + Battery StorageSolar + storage Β· 113 MW Β· withdrawn
- Biomass ProjectOther Β· 67.5 MW Β· withdrawn
- SolarSolar Β· 60.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem