United States β€Ί Grid β€Ί Interconnection queues β€Ί New Hampshire

SOLAR Β· ISO-NE

Solar

Solar is a 19.8 MW solar request withdrawn in the ISO-NE interconnection queue, in Sullivan County, New Hampshire.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2019 (completed)
  2. Withdrawn / abandonedMay 2019 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
878
Grid region
ISO-NE (New England)
Connection point (POI)
Eversource Lost Nation Substation (34.5 kV)
Location
Sullivan County, New Hampshire
Technology
Solar: 19.8 MW
Total requested
19.8 MW
Service type
Energy only (ERIS)
Queue status
Withdrawn
Entered queue
15 April 2019
Proposed online date
November 2020
Withdrawn
May 2019

Location

Marker shows the centre of Sullivan County; the queue data does not give exact sites.

Power plants in New Hampshire Β· Transmission lines in New Hampshire

Other requests in Sullivan County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem