United States βΊ Grid βΊ Interconnection queues βΊ New Hampshire
SOLAR Β· ISO-NESolar
Solar is a 19.8 MW solar request withdrawn in the ISO-NE interconnection queue, in Sullivan County, New Hampshire.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2019 (completed)
- Withdrawn / abandonedMay 2019 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 878
- Grid region
- ISO-NE (New England)
- Connection point (POI)
- Eversource Lost Nation Substation (34.5 kV)
- Location
- Sullivan County, New Hampshire
- Technology
- Solar: 19.8 MW
- Total requested
- 19.8 MW
- Service type
- Energy only (ERIS)
- Queue status
- Withdrawn
- Entered queue
- 15 April 2019
- Proposed online date
- November 2020
- Withdrawn
- May 2019
Location
Marker shows the centre of Sullivan County; the queue data does not give exact sites.
Power plants in New Hampshire Β· Transmission lines in New Hampshire
Other requests in Sullivan County
- Grissom SolarSolar Β· 5.0 MW Β· agreement signed
- LempsterOnshore wind Β· 24.0 MW Β· built
- Hemphill IncreaseOther Β· 3.4 MW Β· built
- SolarSolar Β· 46.5 MW Β· withdrawn
- Claremont SolarSolar Β· 20.0 MW Β· withdrawn
- Nellie SolarSolar Β· 15.0 MW Β· withdrawn
- SolarSolar Β· 10.0 MW Β· withdrawn
- Solar additionSolar Β· 10.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem