Solar addition

Solar addition is a 10.0 MW solar request withdrawn in the ISO-NE interconnection queue, in Sullivan County, New Hampshire.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2020 (completed)
  2. Withdrawn / abandonedMar 2021 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
980
Grid region
ISO-NE (New England)
Connection point (POI)
River Road 46 kV (Bus No 108291) is same as the previous interconnection QP799
Location
Sullivan County, New Hampshire
Technology
Solar: 10.0 MW
Total requested
10.0 MW
Service type
Network resource (NRIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
26 March 2020
Proposed online date
November 2022
Withdrawn
March 2021

Location

Marker shows the centre of Sullivan County; the queue data does not give exact sites.