ONSHORE WIND · ISO-NELempster
Lempster is a 24.0 MW onshore wind request built and operating in the ISO-NE interconnection queue, in Sullivan County, New Hampshire, connecting to NU.
Request details
- Queue ID
- 127
- Grid region
- ISO-NE (New England)
- Utility / transmission owner
- NU
- Connection point (POI)
- PSNH 34.5 kV circuit from Newport Substation
- Location
- Sullivan County, New Hampshire
- Technology
- Wind: 24.0 MW
- Total requested
- 24.0 MW
- Service type
- Other
- Study phase
- IA Executed
- Queue status
- Operational
- Entered queue
- 15 November 2004
- Proposed online date
- November 2008
Location
Marker shows the centre of Sullivan County; the queue data does not give exact sites.
Power plants in New Hampshire · Transmission lines in New Hampshire
Other requests in Sullivan County
- Grissom SolarSolar · 5.0 MW · agreement signed
- Hemphill IncreaseOther · 3.4 MW · built
- SolarSolar · 46.5 MW · withdrawn
- Claremont SolarSolar · 20.0 MW · withdrawn
- SolarSolar · 19.8 MW · withdrawn
- Nellie SolarSolar · 15.0 MW · withdrawn
- SolarSolar · 10.0 MW · withdrawn
- Solar additionSolar · 10.0 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem