United States β€Ί Grid β€Ί Interconnection queues β€Ί New Hampshire

SOLAR Β· ISO-NE

Nellie Solar

Nellie Solar is a 15.0 MW solar request withdrawn in the ISO-NE interconnection queue, in Sullivan County, New Hampshire.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2019 (completed)
  2. Withdrawn / abandonedOct 2024 (project stopped here)
  3. ConsentedJun 2022 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
868
Grid region
ISO-NE (New England)
Connection point (POI)
Eversource 34.5 kV line 3410 out of the North Road substation, extended along Maple Street, Newport NH.
Location
Sullivan County, New Hampshire
Technology
Solar: 15.0 MW
Total requested
15.0 MW
Service type
Energy only (ERIS)
Study phase
Executed
Queue status
Withdrawn
Entered queue
10 April 2019
Agreement signed
21 June 2022
Proposed online date
October 2024
Withdrawn
October 2024

Location

Marker shows the centre of Sullivan County; the queue data does not give exact sites.

Power plants in New Hampshire Β· Transmission lines in New Hampshire

Other requests in Sullivan County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem