United States β€Ί Grid β€Ί Interconnection queues β€Ί New Hampshire

ONSHORE WIND Β· ISO-NE

Wind

Wind is a 16.1 MW onshore wind request withdrawn in the ISO-NE interconnection queue, in Hillsborough County, New Hampshire.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2011 (completed)
  2. Withdrawn / abandonedJul 2013 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
368
Grid region
ISO-NE (New England)
Connection point (POI)
PSNH 34.5 kV to Monadnock substation
Location
Hillsborough County, New Hampshire
Technology
Wind: 16.1 MW
Total requested
16.1 MW
Service type
Network resource (NRIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
27 May 2011
Proposed online date
October 2014
Withdrawn
July 2013

Location

Marker shows the centre of Hillsborough County; the queue data does not give exact sites.

Power plants in New Hampshire Β· Transmission lines in New Hampshire

Other requests in Hillsborough County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem