United States › Grid › Interconnection queues › New Hampshire
ONSHORE WIND · ISO-NEAntrim Wind
Antrim Wind is a 28.4 MW onshore wind request built and operating in the ISO-NE interconnection queue, in Hillsborough County, New Hampshire.
Request details
- Queue ID
- 543
- Grid region
- ISO-NE (New England)
- Connection point (POI)
- Proposed POI is to PSNH 115 kV line L163.
- Location
- Hillsborough County, New Hampshire
- Technology
- Wind: 28.4 MW
- Total requested
- 28.4 MW
- Service type
- Network resource (NRIS)
- Study phase
- Executed
- Queue status
- Operational
- Entered queue
- 2 March 2015
- Agreement signed
- 30 May 2017
- Proposed online date
- December 2019
Location
Marker shows the centre of Hillsborough County; the queue data does not give exact sites.
Power plants in New Hampshire · Transmission lines in New Hampshire
Other requests in Hillsborough County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem