πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί New Hampshire

ONSHORE WIND Β· ISO-NE

Wind

Wind is a 18.0 MW onshore wind request withdrawn in the ISO-NE interconnection queue, in Hillsborough County, New Hampshire.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2010 (completed)
  2. Withdrawn / abandonedNov 2012 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
338
Grid region
ISO-NE (New England)
Connection point (POI)
PSNH 34.5 kV 3140 Circuit
Location
Hillsborough County, New Hampshire
Technology
Wind: 18.0 MW
Total requested
18.0 MW
Queue status
Withdrawn
Entered queue
14 May 2010
Proposed online date
December 2013
Withdrawn
November 2012

Location

Marker shows the centre of Hillsborough County; the queue data does not give exact sites.

Power plants in New Hampshire Β· Transmission lines in New Hampshire

Other requests in Hillsborough County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem