Distribution Wind Alternative is a 2.0 MW onshore wind request withdrawn in the ISO-NE interconnection queue, in Grafton County, New Hampshire.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2008 (completed)
- Withdrawn / abandonedSep 2009 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 255
- Grid region
- ISO-NE (New England)
- Connection point (POI)
- PSNH Ashland 34.5 kV
- Location
- Grafton County, New Hampshire
- Technology
- Wind: 2.0 MW
- Total requested
- 2.0 MW
- Queue status
- Withdrawn
- Entered queue
- 31 March 2008
- Proposed online date
- December 2012
- Withdrawn
- September 2009
Location
Marker shows the centre of Grafton County; the queue data does not give exact sites.
Power plants in New Hampshire · Transmission lines in New Hampshire
Other requests in Grafton County
- Groton Wind FarmOnshore wind · 48.0 MW · built
- Indeck Energy AlexandriaOther · 16.5 MW · built
- Moore Station UprateHydro · 4.6 MW · built
- Comerford Unit #1Hydro · -17.0 MW · built
- SolarSolar · 150 MW · withdrawn
- Energy StorageBattery storage · 100 MW · withdrawn
- SolarSolar · 60.0 MW · withdrawn
- SolarSolar · 54.4 MW · withdrawn
- SolarSolar · 51.0 MW · withdrawn
- Spruce Ridge Wind FarmOnshore wind · 50.8 MW · withdrawn
- SolarSolar · 33.1 MW · withdrawn
- SolarSolar · 27.0 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem