United States › Grid › Interconnection queues › New Hampshire

ONSHORE WIND · ISO-NE

Distribution Wind Alternative

Distribution Wind Alternative is a 2.0 MW onshore wind request withdrawn in the ISO-NE interconnection queue, in Grafton County, New Hampshire.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2008 (completed)
  2. Withdrawn / abandonedSep 2009 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
255
Grid region
ISO-NE (New England)
Connection point (POI)
PSNH Ashland 34.5 kV
Location
Grafton County, New Hampshire
Technology
Wind: 2.0 MW
Total requested
2.0 MW
Queue status
Withdrawn
Entered queue
31 March 2008
Proposed online date
December 2012
Withdrawn
September 2009

Location

Marker shows the centre of Grafton County; the queue data does not give exact sites.

Power plants in New Hampshire · Transmission lines in New Hampshire

Other requests in Grafton County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem