United States β€Ί Grid β€Ί Interconnection queues β€Ί New Hampshire

SOLAR Β· ISO-NE

Solar

Solar is a 10.0 MW solar request withdrawn in the ISO-NE interconnection queue, in Rockingham County, New Hampshire.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2020 (completed)
  2. Withdrawn / abandonedMay 2024 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
956
Grid region
ISO-NE (New England)
Connection point (POI)
Eversource NH 3103 Line (34.5 kV) out of Brentwood substation extended along Exeter Rd
Location
Rockingham County, New Hampshire
Technology
Solar: 10.0 MW
Total requested
10.0 MW
Service type
Energy only (ERIS)
Study phase
In Progress
Queue status
Withdrawn
Entered queue
16 March 2020
Proposed online date
October 2024
Withdrawn
May 2024

Location

Marker shows the centre of Rockingham County; the queue data does not give exact sites.

Power plants in New Hampshire Β· Transmission lines in New Hampshire

Other requests in Rockingham County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem