United States βΊ Grid βΊ Interconnection queues βΊ New Hampshire
SOLAR Β· ISO-NESolar
Solar is a 10.0 MW solar request withdrawn in the ISO-NE interconnection queue, in Rockingham County, New Hampshire.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2020 (completed)
- Withdrawn / abandonedMay 2024 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 956
- Grid region
- ISO-NE (New England)
- Connection point (POI)
- Eversource NH 3103 Line (34.5 kV) out of Brentwood substation extended along Exeter Rd
- Location
- Rockingham County, New Hampshire
- Technology
- Solar: 10.0 MW
- Total requested
- 10.0 MW
- Service type
- Energy only (ERIS)
- Study phase
- In Progress
- Queue status
- Withdrawn
- Entered queue
- 16 March 2020
- Proposed online date
- October 2024
- Withdrawn
- May 2024
Location
Marker shows the centre of Rockingham County; the queue data does not give exact sites.
Power plants in New Hampshire Β· Transmission lines in New Hampshire
Other requests in Rockingham County
- SolarSolar Β· 100 MW Β· in study
- Seabrook Power Uprate7Nuclear Β· 1,265 MW Β· built
- GRE Capacity UprateGas Β· 41.0 MW Β· built
- Newington Gas Turbine UprateGas Β· 27.9 MW Β· built
- EP Newington Energy Capacity IncreaseGas Β· 21.2 MW Β· built
- Seabrook LP Turbine Blade replacementNuclear Β· 13.0 MW Β· built
- Combined Cycle Capacity Increase/ Generator ChangeGas Β· 904 MW Β· withdrawn
- Combined Cycle( See # 226)Gas Β· 563 MW Β· withdrawn
- Battery StorageBattery storage Β· 402 MW Β· withdrawn
- Battery StorageBattery storage Β· 200 MW Β· withdrawn
- Combined Cycle IncreaseGas Β· 33.0 MW Β· withdrawn
- SolarSolar Β· 10.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem