BATTERY STORAGE · ISO-NEBattery Storage
Battery Storage is a 402 MW battery storage request withdrawn in the ISO-NE interconnection queue, in Rockingham County, New Hampshire.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2023 (completed)
- Withdrawn / abandonedJan 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 1364
- Grid region
- ISO-NE (New England)
- Connection point (POI)
- Timber Swamp Rd 345 kV station
- Location
- Rockingham County, New Hampshire
- Technology
- Battery: 402 MW
- Total requested
- 402 MW
- Service type
- Network resource (NRIS)
- Study phase
- System Impact Study
- Queue status
- Withdrawn
- Entered queue
- 1 March 2023
- Proposed online date
- November 2026
- Withdrawn
- January 2025
Location
Marker shows the centre of Rockingham County; the queue data does not give exact sites.
Power plants in New Hampshire · Transmission lines in New Hampshire
Other requests in Rockingham County
- SolarSolar · 100 MW · in study
- Seabrook Power Uprate7Nuclear · 1,265 MW · built
- GRE Capacity UprateGas · 41.0 MW · built
- Newington Gas Turbine UprateGas · 27.9 MW · built
- EP Newington Energy Capacity IncreaseGas · 21.2 MW · built
- Seabrook LP Turbine Blade replacementNuclear · 13.0 MW · built
- Combined Cycle Capacity Increase/ Generator ChangeGas · 904 MW · withdrawn
- Combined Cycle( See # 226)Gas · 563 MW · withdrawn
- Battery StorageBattery storage · 200 MW · withdrawn
- Combined Cycle IncreaseGas · 33.0 MW · withdrawn
- SolarSolar · 10.0 MW · withdrawn
- SolarSolar · 10.0 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem