United States › Grid › Interconnection queues › New Hampshire
SOLAR · ISO-NESolar
Solar is a 100 MW solar request in interconnection study in the ISO-NE interconnection queue, in Rockingham County, New Hampshire.
- PlanningQueued Jul 2023 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Dec 2028 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- 1428
- Grid region
- ISO-NE (New England)
- Connection point (POI)
- A tap at existing 115 kV line between Eversource 115kV Scobie Pond - Pulpit Rock Line A184 115kV. * The new tap will be located at approx. 42.9292184N, -71.2567898W and along a ~6 mile segment of Lin
- Location
- Rockingham County, New Hampshire
- Technology
- Solar: 100 MW
- Total requested
- 100 MW
- Service type
- Network resource (NRIS)
- Study phase
- In Progress (unknown study)
- Queue status
- Active
- Entered queue
- 25 July 2023
- Proposed online date
- December 2028
Location
Marker shows the centre of Rockingham County; the queue data does not give exact sites.
Power plants in New Hampshire · Transmission lines in New Hampshire
Other requests in Rockingham County
- Seabrook Power Uprate7Nuclear · 1,265 MW · built
- GRE Capacity UprateGas · 41.0 MW · built
- Newington Gas Turbine UprateGas · 27.9 MW · built
- EP Newington Energy Capacity IncreaseGas · 21.2 MW · built
- Seabrook LP Turbine Blade replacementNuclear · 13.0 MW · built
- Combined Cycle Capacity Increase/ Generator ChangeGas · 904 MW · withdrawn
- Combined Cycle( See # 226)Gas · 563 MW · withdrawn
- Battery StorageBattery storage · 402 MW · withdrawn
- Battery StorageBattery storage · 200 MW · withdrawn
- Combined Cycle IncreaseGas · 33.0 MW · withdrawn
- SolarSolar · 10.0 MW · withdrawn
- SolarSolar · 10.0 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem