United States › Grid › Interconnection queues › New Hampshire
GAS · ISO-NECombined Cycle Capacity Increase/ Generator Change
Combined Cycle Capacity Increase/ Generator Change is a 904 MW gas request withdrawn in the ISO-NE interconnection queue, in Rockingham County, New Hampshire.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2007 (completed)
- Withdrawn / abandonedJul 2009 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 226
- Grid region
- ISO-NE (New England)
- Connection point (POI)
- 345 kV Seabrook Substation
- Location
- Rockingham County, New Hampshire
- Technology
- Gas: 904 MW
- Total requested
- 904 MW
- Service type
- Other
- Queue status
- Withdrawn
- Entered queue
- 5 September 2007
- Proposed online date
- June 2013
- Withdrawn
- July 2009
Location
Marker shows the centre of Rockingham County; the queue data does not give exact sites.
Power plants in New Hampshire · Transmission lines in New Hampshire
Other requests in Rockingham County
- SolarSolar · 100 MW · in study
- Seabrook Power Uprate7Nuclear · 1,265 MW · built
- GRE Capacity UprateGas · 41.0 MW · built
- Newington Gas Turbine UprateGas · 27.9 MW · built
- EP Newington Energy Capacity IncreaseGas · 21.2 MW · built
- Seabrook LP Turbine Blade replacementNuclear · 13.0 MW · built
- Combined Cycle( See # 226)Gas · 563 MW · withdrawn
- Battery StorageBattery storage · 402 MW · withdrawn
- Battery StorageBattery storage · 200 MW · withdrawn
- Combined Cycle IncreaseGas · 33.0 MW · withdrawn
- SolarSolar · 10.0 MW · withdrawn
- SolarSolar · 10.0 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem