SOLAR · ISO-NETilton Heights Energy Center
Tilton Heights Energy Center is a 19.9 MW solar request withdrawn in the ISO-NE interconnection queue, in Belknap County, New Hampshire.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2018 (completed)
- Withdrawn / abandonedNov 2024 (project stopped here)
- ConsentedDec 2021 (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 785
- Grid region
- ISO-NE (New England)
- Connection point (POI)
- POI at Eversource 34.5 kV circuit #3216 (sourced from Webster SS) near pole #3798/1.
- Location
- Belknap County, New Hampshire
- Technology
- Solar: 19.9 MW
- Total requested
- 19.9 MW
- Service type
- Energy only (ERIS)
- Study phase
- Executed
- Queue status
- Withdrawn
- Entered queue
- 26 September 2018
- Agreement signed
- 29 December 2021
- Proposed online date
- September 2025
- Withdrawn
- November 2024
Location
Marker shows the centre of Belknap County; the queue data does not give exact sites.
Power plants in New Hampshire · Transmission lines in New Hampshire
Other requests in Belknap County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem