Tilton Heights Energy Center

Tilton Heights Energy Center is a 19.9 MW solar request withdrawn in the ISO-NE interconnection queue, in Belknap County, New Hampshire.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2018 (completed)
  2. Withdrawn / abandonedNov 2024 (project stopped here)
  3. ConsentedDec 2021 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
785
Grid region
ISO-NE (New England)
Connection point (POI)
POI at Eversource 34.5 kV circuit #3216 (sourced from Webster SS) near pole #3798/1.
Location
Belknap County, New Hampshire
Technology
Solar: 19.9 MW
Total requested
19.9 MW
Service type
Energy only (ERIS)
Study phase
Executed
Queue status
Withdrawn
Entered queue
26 September 2018
Agreement signed
29 December 2021
Proposed online date
September 2025
Withdrawn
November 2024

Location

Marker shows the centre of Belknap County; the queue data does not give exact sites.

Power plants in New Hampshire · Transmission lines in New Hampshire

Other requests in Belknap County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem