NESO TEC REGISTER · GREAT BRITAIN

Grid connection projects in the connection queue

Every generator, battery and interconnector with an agreement to connect to the GB transmission network, from early scoping to built. Filter by technology, stage or network, and open a project for its connection details.

Projects shown2,255782.1 GW in total
In planning1,590scoping or awaiting consent
Consented or building265closest to connecting
Built400connected and operating

Map

Loading projects…

Voltage400 kV275 kV132 kVHVDCNew HVAC

ProjectsPlanningConsentedConstructionBuiltMajor project with its own page

Projects

2,255 projects · page 34 of 46
ProjectCapacityStageConnection siteFrom
South Street BESS
Battery storage · South Street BESS Limited
63 MWScoping Partrick GSP
SP Transmission (south Scotland)
Jun 2031
Tomchrasky Wind Farm
Onshore wind · E Power Limited
63 MWConsents Approved Tomchrasky Wind Farm 132/33kV Substation
SSEN Transmission (north Scotland)
Mar 2032
Windy Standard II (Brockloch Rig) Wind Farm
Onshore wind · Brockloch Rig Windfarm Limited
62 MWBuilt Dun Hill 132/33kV
SP Transmission (south Scotland)
Clunie (part of the Clunie Cascade)
Hydro and pumped storage · Sse Generation Limited
61 MWBuilt Clunie GSP
SSEN Transmission (north Scotland)
AGS Coatbridge
Battery storage · Advance Grid Solutions Limited
60 MWScoping Coatbridge GSP
SP Transmission (south Scotland)
Apr 2033
Blacklaw Extension
Wind + storage · Scottish Power Renewables (UK) Limited
60 MWBuilt Blacklaw Extension 132/33kV
SP Transmission (south Scotland)
Cloud Hill Windfarm
Wind + storage · Cloud Hill Windfarm Limited
60 MWScoping Glenglass 132/33kV
SP Transmission (south Scotland)
Oct 2036
Crakaig Wind Energy Hub
Wind + storage · Crakaig Wind Energy Hub Limited
60 MWScoping Brora 132/33Kv Grid Supply Point Substation
SSEN Transmission (north Scotland)
Oct 2034
D&G 2
Onshore wind · Greyland Energy Park Limited
60 MWScoping Ladyburn 132/33Kv Grid Supply Point Substation
SP Transmission (south Scotland)
Aug 2031
Douglas West Extension
Onshore wind · Douglas West Extension Ltd
60 MWBuilt Douglas West Extension Windfarm
SP Transmission (south Scotland)
Galileo 10
Battery storage · Galileo 10 Limited
60 MWScoping Armadale 132kV Substation
SP Transmission (south Scotland)
Oct 2031
Inchbean Energy Park
Battery storage · Brockwell Storage & Solar Limited
60 MWConsents Approved Kilmarnock Town 275/33kV Substation
SP Transmission (south Scotland)
Feb 2027
Kennoxhead Wind Farm Extension
Onshore wind · Kennoxhead Wind Farm Limited
60 MWBuilt Middlemuir Wind Farm Collector Substation
SP Transmission (south Scotland)
Killean Wind Farm
Onshore wind · Renewable Energy Systems Limited
60 MWScoping Carradale 3 132/33Kv Grid Supply Point Substation
SSEN Transmission (north Scotland)
Oct 2034
Kirkton Wind Farm
Onshore wind · Kirkton Wind Farm Limited
60 MWAwaiting Consents Connagill 275kV Substation
SSEN Transmission (north Scotland)
Oct 2029
Knockkippen Energy Park
Solar + storage · Knockkippen Wind Energy Limited
60 MWScoping Ayr GSP
SP Transmission (south Scotland)
Aug 2028
Longriggs Energy Park
Battery storage · Brockwell Storage & Solar Limited
60 MWAwaiting Consents Devonside 132/33kV
SP Transmission (south Scotland)
Apr 2039
Menter Mon Morlais Anglesey Marine Energy
Other · Menter Môn Morlais Limited
60 MWUnder Construction/Commissioning Penrhos GSP
National Grid (England & Wales)
Mar 2029
Moy Wind Farm
Onshore wind · Eneco Moy Limited
60 MWBuilt Inverness GSP
SSEN Transmission (north Scotland)
Outh Muir Energy Park
Solar + storage · Grupotec Solar UK 4 Ltd
60 MWScoping Dunfermline 132/33kV
SP Transmission (south Scotland)
Apr 2028
Penninghame Wind Farm
Onshore wind · Edf Energy Renewables Limited
60 MWScoping Penninghame Substation
SP Transmission (south Scotland)
Oct 2031
Rochester Renewable Project
Solar + storage · Vattenfall Wind Power Ltd
60 MWScoping Kingsnorth 132kV Substation
National Grid (England & Wales)
Sep 2028
Scaw Law Wind Farm
Wind + storage · Perigus Energy UK Limited
60 MWScoping Scaw Law 132kV substation
SP Transmission (south Scotland)
Oct 2036
Scottish Water Bonnybridge STW 60MW BESS
Battery storage · Bluestone Energy Ltd
60 MWScoping Bonnybridge 132/33kV
SP Transmission (south Scotland)
Oct 2030
Scottish Water Linwood STW 60MW BESS
Battery storage · Bluestone Linwood 1 Ltd
60 MWScoping Jonhstone 132/33kV Substation
SP Transmission (south Scotland)
Jun 2028
Sec 1 BESS
Battery storage · Bluestone Energy Ltd
60 MWScoping Finnieston GSP
SP Transmission (south Scotland)
Jul 2031
Stanley Water WTW BESS
Battery storage · Bluestone Energy Ltd
60 MWScoping Paisley GSP
SP Transmission (south Scotland)
Oct 2028
Touch Energy Park
Wind + storage · Naturalis Energy Developments Ltd
60 MWScoping Stirling 132/33kV
SP Transmission (south Scotland)
Jan 2029
Whitehill 60MW BESS
Battery storage · GPC 013 LTD
60 MWScoping Drumchapel 275/33kV
SP Transmission (south Scotland)
Oct 2028
Knockcronal Wind Farm
Onshore wind · Knockcronal Wind Farm Limited
59 MWAwaiting Consents Knockcronal Wind Farm 33kV Substation
SP Transmission (south Scotland)
Oct 2029
Balnespick Wind Farm
Wind + storage · Fred Olsen Renewables Limited
58 MWScoping Balnespick Wind Farm 132kV/33kV Substation
SSEN Transmission (north Scotland)
Oct 2032
Beinn Ghlas
Onshore wind · Headwind Development Services Limited
58 MWAwaiting Consents Taynuilt GSP
SSEN Transmission (north Scotland)
Oct 2034
Melvich Wind Energy Hub
Wind + storage · Melvich Wind Energy Hub Limited
58 MWAwaiting Consents Melvich Community Wind Farm 132/33kV Substation
SSEN Transmission (north Scotland)
Apr 2030
The Drum Wind Farm
Onshore wind · Wind Estate (UK) Limited
58 MWScoping Glenmuckloch 132kV Substation
SP Transmission (south Scotland)
Oct 2037
Bicker Fen 1 Solar
Solar + storage · Agr Solar 2 Limited
57 MWConsents Approved Bicker Fen 400kV Substation
National Grid (England & Wales)
Apr 2033
Aberthaw (Tertiary)
Solar + storage · Aberthaw Green Limited
57 MWScoping Aberthaw 275kV Substation
National Grid (England & Wales)
Oct 2029
Arkwright
Battery storage · Arlington (Group Services) Limited
57 MWScoping Chesterfield 400kV Substation (Not yet constructed)
National Grid (England & Wales)
Oct 2034
Berkswell (Tertiary)
Solar + storage · Enso Green Holdings P Limited
57 MWConsents Approved Berkswell 275kV Substation
National Grid (England & Wales)
May 2028
Bicker Fen 2 Solar
Solar + storage · Agr Solar 3 Limited
57 MWScoping Bicker Fen 400kV Substation
National Grid (England & Wales)
Apr 2033
Biggleswade BESS
Battery storage · Central Bedfordshire Council
57 MWScoping Biggleswade 400kV Substation
National Grid (England & Wales)
Sep 2029
Bolney (tertiary)
Solar + storage · Bolney Green Limited
57 MWScoping Bolney 400kV Substation
National Grid (England & Wales)
May 2028
Capenhurst Tertiary Connection
Battery storage · Hd888Cap Limited
57 MWBuilt Capenhurst 275kV Substation
National Grid (England & Wales)
Braintree
Solar + storage · Pivoted Power LLP
57 MWConsents Approved Braintree 400kV Substation
National Grid (England & Wales)
May 2027
Bramford (Tertiary)
Solar + storage · Damsongreen Energyfarm Limited
57 MWBuilt Bramford 400kV Substation
National Grid (England & Wales)
Bramford 2 GEC (Ethos Green)
Solar + storage · Bramford 2 Green Energy Centre Ltd
57 MWAwaiting Consents Bramford 400kV Substation
National Grid (England & Wales)
Jul 2032
Bramford Tertiary
Solar + storage · Bramford Green Limited
57 MWConsents Approved Bramford 400kV Substation
National Grid (England & Wales)
Oct 2029
Bramley (tertiary)
Solar + storage · Bramley Solar Limited
57 MWUnder Construction/Commissioning Bramley 400kV Substation
National Grid (England & Wales)
Oct 2027
Bramley BESS
Battery storage · Bramley BESS Limited
57 MWUnder Construction/Commissioning Bramley 400kV Substation
National Grid (England & Wales)
Oct 2037
Bridgwater (tertiary)
Solar + storage · Enso Green Holdings H Limited
57 MWScoping Bridgwater 400/132kV Substation
National Grid (England & Wales)
Aug 2028
Bridgwater 2 (tertiary) - New Conn
Solar + storage · Bridgwater Green Limited
57 MWScoping Bridgewater 400kV Substation
National Grid (England & Wales)
Aug 2029
Page 34 of 46

Sources: NESO Transmission Entry Capacity (TEC) register and interconnector register (downloaded 8 November 2026); NESO Clean Power 2030 network map (existing and planned circuits, substations and network projects); National Grid Electricity Transmission overhead line routes. Contains data from NESO, licensed under the NESO Open Data Licence, and National Grid open data. Projects are placed at their connection substation, not the generating site; projects at new, unnamed “connection nodes” are listed but not mapped.