🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

Home › Grid infrastructure › Connection queue

NESO TEC REGISTER · GREAT BRITAIN

Grid connection projects in the connection queue

Every generator, battery and interconnector with an agreement to connect to the GB transmission network, from early scoping to built. Filter by technology, stage or network, and open a project for its connection details.

Projects shown2,255782.1 GW in total
In planning1,590scoping or awaiting consent
Consented or building265closest to connecting
Built400connected and operating

Map

Loading projects…

Voltage400 kV275 kV132 kVHVDCNew HVAC

ProjectsPlanningConsentedConstructionBuiltMajor project with its own page

Projects

2,255 projects · page 33 of 46
ProjectCapacityStageConnection siteFrom
Strath Oykel Wind Farm
Wind + storage · Energyfarm Strath Oykel LLP
74 MWAwaiting Consents Shin 1 GSP
SSEN Transmission (north Scotland)
Oct 2032
Isle of Man Interconnector
Interconnector · Manx Utilities
74 MWBuilt Bispham 132kV Substation
National Grid (England & Wales)
Arecleoch Extension Windfarm
Onshore wind · Scottish Power Renewables (UK) Limited
73 MWScoping Arecleoch 132/33kV
SP Transmission (south Scotland)
Aug 2026
Craig Watch Wind Farm
Onshore wind · Craig Watch Wind Farm Limited
73 MWAwaiting Consents Craig Watch Wind Farm 132Kv Substation
SSEN Transmission (north Scotland)
May 2031
Killeal
Onshore wind · Abei Energy Limited
73 MWScoping Newton Stewart GSP
SP Transmission (south Scotland)
Oct 2036
Leithenwater Wind Farm
Wind + storage · Leithenwater Wind Energy Hub Limited
73 MWScoping Galashiels 132/33kV
SP Transmission (south Scotland)
Apr 2030
Narachan Wind Farm
Onshore wind · Energyfarm UK Narachan LLP
73 MWScoping Carradale 1 GSP
SSEN Transmission (north Scotland)
Apr 2030
Sloy G1 and G4
Hydro and pumped storage · Sse Generation Limited
73 MWBuilt Sloy GSP
SSEN Transmission (north Scotland)
Benbrack Wind Farm
Onshore wind · Benbrack Wind Farm Limited
72 MWBuilt Benbrack Wind Farm 132/33kV Substation
SP Transmission (south Scotland)
Calon y Gwynt
Solar + storage · Wind 2 Project 3 Limited
72 MWScoping Mid Wales Connection Node A
National Grid (England & Wales)
Oct 2037
Vale of Leven Wind Farm
Onshore wind · Vale of Leven Wind Farm Limited
72 MWScoping Vale of Leven 132kV substation
SP Transmission (south Scotland)
Oct 2033
Corriegarth 2 Wind Farm
Onshore wind · Corriegarth 2 Wind Farm Limited
70 MWScoping Corriegarth 132/33kV substation
SSEN Transmission (north Scotland)
Jul 2027
Don Cossack
Battery storage · Don Cossack Ltd
70 MWAwaiting Consents Tynemouth 275kV Substation
National Grid (England & Wales)
Jun 2034
Hunterston Wind Farm
Wind + storage · Galileo 01 Limited
70 MWScoping Hunterston 400/132kV
SP Transmission (south Scotland)
Apr 2033
Port of Mostyn
Other · Mostyn Seapower Limited
70 MWScoping Connah's Quay 400kV Substation
National Grid (England & Wales)
Dec 2030
Tinnisburn Wind Farm
Wind + storage · Baywa R.e. UK Limited
70 MWScoping Tinnisburn Wind Farm 132Kv Substation
SP Transmission (south Scotland)
Oct 2031
Tormsdale Windfarm
Solar + storage · Asuk Holdco 1 Limited
70 MWScoping Mybster 3 132/33kV Substation
SSEN Transmission (north Scotland)
Jun 2028
Lorg Wind Farm
Onshore wind · RWE Renewables UK Onshore Wind Limited
70 MWAwaiting Consents Lorg Wind Farm 132/32kV
SP Transmission (south Scotland)
Apr 2028
Corriegarth
Onshore wind · Corriegarth Wind Energy Limited
69 MWBuilt Corriegarth 132/33kV substation
SSEN Transmission (north Scotland)
Dersalloch Wind Farm
Onshore wind · Scottish Power Renewables (UK) Limited
69 MWBuilt Dersalloch 132/33kV
SP Transmission (south Scotland)
Enoch Hill
Wind + storage · RWE Renewables UK Onshore Wind Limited
69 MWBuilt Enoch Hill 132/33kV Substation
SP Transmission (south Scotland)
Lochluichart
Onshore wind · Lzn Limited
69 MWBuilt Corriemoillie 132kV Substation
SSEN Transmission (north Scotland)
Correen Hills Wind Farm
Onshore wind · Edf Energy Renewables Limited
68 MWScoping Correen Hills Wind Farm 132kV Substation
SSEN Transmission (north Scotland)
Sep 2031
Ladyfield Renewable Energy Park
Battery storage · Ladyfield Renewable Energy Park Ltd
68 MWScoping Creag Dhubh 275/132/33kV
SSEN Transmission (north Scotland)
Oct 2029
Troston Wind Farm
Onshore wind · Troston Windfarm Limited
68 MWAwaiting Consents Margree 132/33kV Collector Substation
SP Transmission (south Scotland)
Oct 2029
Strathy North Wind
Onshore wind · Strathy Wind Farm Limited
68 MWBuilt Strathy North 132/33kV Substation
SSEN Transmission (north Scotland)
Blarghour Wind
Onshore wind · Blarghour Wind Farm Limited
67 MWConsents Approved Blarghour Substation
SSEN Transmission (north Scotland)
Apr 2029
Cairn Duhie Wind Farm
Onshore wind · Cairn Duhie Energy Limited
67 MWConsents Approved Berryburn 275/33kV GSP Substation
SSEN Transmission (north Scotland)
Oct 2028
Cloich Forest Wind Farm
Onshore wind · Edf Energy Renewables Limited
67 MWScoping Cloich 132kV Substation
SP Transmission (south Scotland)
Jul 2029
Greystone Knowe Windfarm
Wind + storage · Greystone Knowe Windfarm Limited
67 MWScoping Gala North 132Kv Substation
SP Transmission (south Scotland)
Oct 2033
Harting Rig Wind Farm
Onshore wind · Kype Extension Wind Farm Limited
67 MWBuilt Kype Muir 132/33kV
SP Transmission (south Scotland)
Bilbo Farm
Solar + storage · Lel Bilbo Solar Limited
67 MWScoping Strichen 132/33kV GSP Substation
SSEN Transmission (north Scotland)
Oct 2033
Berry Burn Wind Farm
Onshore wind · Berry Burn Wind Farm Limited
67 MWBuilt Berry Burn GSP
SSEN Transmission (north Scotland)
Gaerwen Wind Farm
Onshore wind · RWE Renewables UK Onshore Wind Limited
67 MWAwaiting Consents Gwyddelwern 400kV Substation
National Grid (England & Wales)
Jun 2027
Kilbraur Wind Farm
Onshore wind · Kilbraur Wind Energy Limited
67 MWBuilt Kilbraur Wind Farm Substation
SSEN Transmission (north Scotland)
Appin Wind Farm
Onshore wind · Appin Wind Farm Limited
66 MWScoping Appin Wind Farm 132kV Substation
SP Transmission (south Scotland)
Oct 2031
Heastabhal Wind Farm
Onshore wind · RWE Renewables UK Onshore Wind Limited
66 MWScoping Heastabhal Wind Farm Substation 132 KV
SSEN Transmission (north Scotland)
Oct 2033
Hoolan Hills Renewable Energy Park
Onshore wind · Ridge Clean Energy Ltd
66 MWScoping Holm Hill 132kV Substation
SP Transmission (south Scotland)
Oct 2037
Wether Hill
Onshore wind · Scottish Power Renewables (UK) Limited
66 MWScoping Wether Hill 132/33KV Substation
SP Transmission (south Scotland)
Sep 2031
Millennium Wind
Onshore wind · Millennium Wind Energy Limited
65 MWBuilt Millennium GSP
SSEN Transmission (north Scotland)
Allt Domhain Wind Farm
Onshore wind · Energyfarm Allt Domhain Ltd
65 MWScoping Carradale 3 132/33Kv Grid Supply Point Substation
SSEN Transmission (north Scotland)
Oct 2035
Gunfleet Sands II Offshore Wind Farm
Offshore wind · Gunfleet Sands II Ltd
64 MWBuilt Gunfleet Sands 33/132kV Offshore
National Grid (England & Wales)
Scawd Law Wind Farm
Wind + storage · Fred Olsen Renewables Limited
64 MWScoping Gala North 400/132kV Substation
SP Transmission (south Scotland)
Apr 2032
Aikengall II Windfarm
Onshore wind · Aikengall II Community Wind Company Limited
64 MWBuilt Wester Dod 132kV
SP Transmission (south Scotland)
Strathy Wood Wind Farm
Onshore wind · RWE Renewables UK Onshore Wind Limited
64 MWConsents Approved Strathy Wood 132/33kV Substation
SSEN Transmission (north Scotland)
Dec 2029
AGS Calderside PV Solar
Solar · Advance Grid Solutions Limited
63 MWScoping Clydesmill 275/33kV
SP Transmission (south Scotland)
May 2027
Benthead Solar
Solar + storage · Benthead Solar Limited
63 MWConsents Approved Kilwinning 132/33kV
SP Transmission (south Scotland)
Apr 2025
Clashindarroch 2
Onshore wind · Vattenfall Wind Power Ltd
63 MWUnder Construction/Commissioning Cairnford GSP
SSEN Transmission (north Scotland)
Jun 2027
Divot Hill Wind Farm
Wind + storage · Energyfarm Divot Hill Ltd
63 MWScoping Divot Hill 132/33 kV Substation
SP Transmission (south Scotland)
Oct 2036
Dolphingstone Farm
Battery storage · Bssl East Lothian 1 Ltd
63 MWConsents Approved Cockenzie 275/33kV Substation
SP Transmission (south Scotland)
Oct 2028
Page 33 of 46

Sources: NESO Transmission Entry Capacity (TEC) register and interconnector register (downloaded 8 November 2026); NESO Clean Power 2030 network map (existing and planned circuits, substations and network projects); National Grid Electricity Transmission overhead line routes. Contains data from NESO, licensed under the NESO Open Data Licence, and National Grid open data. Projects are placed at their connection substation, not the generating site; projects at new, unnamed “connection nodes” are listed but not mapped.