Benthead Solar

Benthead Solar is a 63 MW solar + storage project consented, connecting to the SP Transmission (south Scotland) network at Kilwinning 132/33kV, with capacity due from April 2025. The connection agreement is held by Benthead Solar Limited.

Project stageConsented
  1. Planning (completed)
  2. Consented (current stage)
  3. Construction (not yet reached)
  4. OperatingFrom Apr 2025 (not yet reached)
  5. Closed (not yet reached)

Connection details

NESO project number
PRO-001881
Customer
Benthead Solar Limited
Technology
Energy Storage System, PV Array (Photo Voltaic/solar)
Total capacity
63 MW
Change in this agreement
+63 MW
Capacity effective from
3 April 2025
Connection site
Kilwinning 132/33kV
Transmission owner
SP Transmission (south Scotland)
Connection type
Embedded (connects through the local distribution network)
NESO project status
Consents Approved
Connections reform gate
Gate 2

Connection site

The marker shows the connection substation, not the project itself, with the transmission network around it.

Projects connecting near Kilwinning Β· Grid map

Other projects at Kilwinning 132/33kV

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem