🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

Grid infrastructure › Connection queue › Battery storage

BATTERY STORAGE · SPT

Ardoch Farm Battery Storage

Ardoch Farm Battery Storage is a 27 MW battery storage project in planning, connecting to the SP Transmission (south Scotland) network at Kilwinning 132/33kV, with capacity due from April 2026. The connection agreement is held by Capbal (Kilwinning) Limited.

Project stageIn planning
  1. Planning (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingFrom Apr 2026 (not yet reached)
  5. Closed (not yet reached)

Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.

Connection details

NESO project number
PRO-002431
Customer
Capbal (Kilwinning) Limited
Technology
Energy Storage System
Total capacity
27 MW
Change in this agreement
+27 MW
Capacity effective from
30 April 2026
Connection site
Kilwinning 132/33kV
Transmission owner
SP Transmission (south Scotland)
Connection type
Embedded (connects through the local distribution network)
NESO project status
Scoping

Connection site

The marker shows the connection substation, not the project itself, with the transmission network around it.

Projects connecting near Kilwinning · Grid map

Other projects at Kilwinning 132/33kV

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem