Grid infrastructure β€Ί Connection queue β€Ί Battery storage

BATTERY STORAGE Β· SPT

Flemyland Battery Storage

Flemyland Battery Storage is a 100 MW battery storage project consented, connecting to the SP Transmission (south Scotland) network at Kilwinning 132/33kV, with capacity due from April 2029. The connection agreement is held by Flemyland Battery Storage Limited.

Project stageConsented
  1. Planning (completed)
  2. Consented (current stage)
  3. Construction (not yet reached)
  4. OperatingFrom Apr 2029 (not yet reached)
  5. Closed (not yet reached)

Connection details

NESO project number
PRO-002360
Customer
Flemyland Battery Storage Limited
Technology
Energy Storage System
Total capacity
100 MW
Change in this agreement
+100 MW
Capacity effective from
27 April 2029
Connection site
Kilwinning 132/33kV
Transmission owner
SP Transmission (south Scotland)
Connection type
Direct connection to the transmission network
NESO project status
Consents Approved
Connections reform gate
Gate 2

Connection site

The marker shows the connection substation, not the project itself, with the transmission network around it.

Projects connecting near Kilwinning Β· Grid map

Other projects at Kilwinning 132/33kV

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem