Grid infrastructure › Connection queue › Battery storage

BATTERY STORAGE · SPT

Dolphingstone Farm

Dolphingstone Farm is a 63 MW battery storage project consented, connecting to the SP Transmission (south Scotland) network at Cockenzie 275/33kV Substation, with capacity due from October 2028. The connection agreement is held by Bssl East Lothian 1 Ltd.

Project stageConsented
  1. Planning (completed)
  2. Consented (current stage)
  3. Construction (not yet reached)
  4. OperatingFrom Oct 2028 (not yet reached)
  5. Closed (not yet reached)

Connection details

NESO project number
PRO-002451
Customer
Bssl East Lothian 1 Ltd
Technology
Energy Storage System
Total capacity
63 MW
Change in this agreement
+63 MW
Capacity effective from
31 October 2028
Connection site
Cockenzie 275/33kV Substation
Transmission owner
SP Transmission (south Scotland)
Connection type
Embedded (connects through the local distribution network)
NESO project status
Consents Approved
Connections reform gate
Gate 2

Connection site

The marker shows the connection substation, not the project itself, with the transmission network around it.

Projects connecting near Cockenzie · Grid map

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem