Grid infrastructure › Connection queue › Onshore wind
ONSHORE WIND · SHETCorreen Hills Wind Farm
Correen Hills Wind Farm is a 68 MW onshore wind project in planning, connecting to the SSEN Transmission (north Scotland) network at Correen Hills Wind Farm 132kV Substation, with capacity due from September 2031. The connection agreement is held by Edf Energy Renewables Limited.
- Planning (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingFrom Sep 2031 (not yet reached)
- Closed (not yet reached)
Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.
Connection details
- NESO project number
- PRO-001825
- Customer
- Edf Energy Renewables Limited
- Technology
- Wind Onshore
- Total capacity
- 68 MW
- Change in this agreement
- +68 MW
- Capacity effective from
- 30 September 2031
- Connection site
- Correen Hills Wind Farm 132kV Substation
- Transmission owner
- SSEN Transmission (north Scotland)
- Connection type
- Direct connection to the transmission network
- NESO project status
- Scoping
- Connections reform gate
- Gate 1
Connection site
The connection site could not be placed on the map.
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem