Grid infrastructure › Connection queue › Onshore wind
ONSHORE WIND · SHETCraig Watch Wind Farm
Craig Watch Wind Farm is a 73 MW onshore wind project in planning, connecting to the SSEN Transmission (north Scotland) network at Craig Watch Wind Farm 132Kv Substation, with capacity due from May 2031. The connection agreement is held by Craig Watch Wind Farm Limited.
- Planning (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingFrom May 2031 (not yet reached)
- Closed (not yet reached)
Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.
Connection details
- NESO project number
- PRO-001877
- Customer
- Craig Watch Wind Farm Limited
- Technology
- Wind Onshore
- Total capacity
- 73 MW
- Change in this agreement
- +73 MW
- Capacity effective from
- 15 May 2031
- Connection site
- Craig Watch Wind Farm 132Kv Substation
- Transmission owner
- SSEN Transmission (north Scotland)
- Connection type
- Direct connection to the transmission network
- NESO project status
- Awaiting Consents
- Connections reform gate
- Gate 1
Connection site
The connection site could not be placed on the map.
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem