ONSHORE WIND Β· SPTHarting Rig Wind Farm
Harting Rig Wind Farm is a 67 MW onshore wind project built and connected, connecting to the SP Transmission (south Scotland) network at Kype Muir 132/33kV. The connection agreement is held by Kype Extension Wind Farm Limited.
Connection details
- NESO project number
- PRO-000303
- Customer
- Kype Extension Wind Farm Limited
- Technology
- Wind Onshore
- Total capacity
- 67 MW
- Already connected
- 67 MW
- Connection site
- Kype Muir 132/33kV
- Transmission owner
- SP Transmission (south Scotland)
- Connection type
- Direct connection to the transmission network
- NESO project status
- Built