WIND + STORAGE Β· SPT

Enoch Hill

Enoch Hill is a 69 MW wind + storage project built and connected, connecting to the SP Transmission (south Scotland) network at Enoch Hill 132/33kV Substation. The connection agreement is held by RWE Renewables UK Onshore Wind Limited.

Project stageOperating
  1. Planning (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. Operating (current stage)
  5. Closed (not yet reached)

Connection details

NESO project number
PRO-000152
Customer
RWE Renewables UK Onshore Wind Limited
Technology
Energy Storage System, Wind Onshore
Total capacity
69 MW
Already connected
69 MW
Connection site
Enoch Hill 132/33kV Substation
Transmission owner
SP Transmission (south Scotland)
Connection type
Direct connection to the transmission network
NESO project status
Built
Connections reform gate
Gate 2

Connection site

The connection site could not be placed on the map.

Projects connecting near Enoch Hill Β· Grid map

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem