Grid infrastructure › Connection queue › Battery storage

BATTERY STORAGE · NGET

Biggleswade BESS

Biggleswade BESS is a 57 MW battery storage project in planning, connecting to the National Grid (England & Wales) network at Biggleswade 400kV Substation, with capacity due from September 2029. The connection agreement is held by Central Bedfordshire Council.

Project stageIn planning
  1. Planning (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingFrom Sep 2029 (not yet reached)
  5. Closed (not yet reached)

Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.

Connection details

NESO project number
PRO-002165
Customer
Central Bedfordshire Council
Technology
Energy Storage System
Total capacity
57 MW
Change in this agreement
+57 MW
Capacity effective from
28 September 2029
Connection site
Biggleswade 400kV Substation
Transmission owner
National Grid (England & Wales)
Connection type
Direct connection to the transmission network
NESO project status
Scoping
Connections reform gate
Gate 1

Connection site

The marker shows the place the connection site is named after, not the project itself, with the transmission network around it.

Projects connecting near Biggleswade · Grid map

Other projects at Biggleswade 400kV Substation

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem