Grid infrastructure β€Ί Connection queue β€Ί Solar + storage

SOLAR + STORAGE Β· NGET

Greengage Farm

Greengage Farm is a 500 MW solar + storage project in planning, connecting to the National Grid (England & Wales) network at Biggleswade 400kV Substation, with capacity due from October 2034. The connection agreement is held by Renewable Energy Systems Limited.

Project stageIn planning
  1. Planning (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingFrom Oct 2034 (not yet reached)
  5. Closed (not yet reached)

Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.

Connection details

NESO project number
PRO-004675
Customer
Renewable Energy Systems Limited
Technology
Energy Storage System, PV Array (Photo Voltaic/solar)
Total capacity
500 MW
Change in this agreement
+500 MW
Capacity effective from
31 October 2034
Connection site
Biggleswade 400kV Substation
Transmission owner
National Grid (England & Wales)
Connection type
Direct connection to the transmission network
NESO project status
Scoping
Connections reform gate
Gate 1

Connection site

The marker shows the place the connection site is named after, not the project itself, with the transmission network around it.

Projects connecting near Biggleswade Β· Grid map

Other projects at Biggleswade 400kV Substation

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem