Grid infrastructure βΊ Connection queue βΊ Solar + storage
SOLAR + STORAGE Β· NGETBramford (Tertiary)
Bramford (Tertiary) is a 57 MW solar + storage project built and connected, connecting to the National Grid (England & Wales) network at Bramford 400kV Substation. The connection agreement is held by Damsongreen Energyfarm Limited.
Connection details
- NESO project number
- PRO-001016
- Customer
- Damsongreen Energyfarm Limited
- Technology
- Energy Storage System, PV Array (Photo Voltaic/solar)
- Total capacity
- 57 MW
- Already connected
- 57 MW
- Connection site
- Bramford 400kV Substation
- Transmission owner
- National Grid (England & Wales)
- Connection type
- Direct connection to the transmission network
- NESO project status
- Built
Connection site
The marker shows the connection substation, not the project itself, with the transmission network around it.
Other projects at Bramford 400kV Substation
- Alcemi Bramford Battery Energy Storage FacilityBattery storage Β· 500 MW Β· Scoping
- Bramford BESSBattery storage Β· 300 MW Β· Consents Approved
- ER BRF 2 EnergySolar + storage Β· 249 MW Β· Scoping
- Bramford 2 GEC (Ethos Green)Solar + storage Β· 57 MW Β· Awaiting Consents
- Bramford TertiarySolar + storage Β· 57 MW Β· Consents Approved
- Bramford TertiarySolar + storage Β· 50 MW Β· Consents Approved
- ThetfordOther Β· 41 MW Β· Built
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem