Grid infrastructure βΊ Connection queue βΊ Solar + storage
SOLAR + STORAGE Β· NGETER BRF 2 Energy
ER BRF 2 Energy is a 249 MW solar + storage project in planning, connecting to the National Grid (England & Wales) network at Bramford 400kV Substation, with capacity due from July 2033. The connection agreement is held by Er Project Development Co Limited.
- Planning (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingFrom Jul 2033 (not yet reached)
- Closed (not yet reached)
Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.
Connection details
- NESO project number
- PRO-003725
- Customer
- Er Project Development Co Limited
- Technology
- Energy Storage System, PV Array (Photo Voltaic/solar)
- Total capacity
- 249 MW
- Change in this agreement
- +249 MW
- Capacity effective from
- 30 July 2033
- Connection site
- Bramford 400kV Substation
- Transmission owner
- National Grid (England & Wales)
- Connection type
- Direct connection to the transmission network
- NESO project status
- Scoping
- Connections reform gate
- Gate 1
Connection site
The marker shows the connection substation, not the project itself, with the transmission network around it.
Other projects at Bramford 400kV Substation
- Alcemi Bramford Battery Energy Storage FacilityBattery storage Β· 500 MW Β· Scoping
- Bramford BESSBattery storage Β· 300 MW Β· Consents Approved
- Bramford (Tertiary)Solar + storage Β· 57 MW Β· Built
- Bramford 2 GEC (Ethos Green)Solar + storage Β· 57 MW Β· Awaiting Consents
- Bramford TertiarySolar + storage Β· 57 MW Β· Consents Approved
- Bramford TertiarySolar + storage Β· 50 MW Β· Consents Approved
- ThetfordOther Β· 41 MW Β· Built
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem