Grid infrastructure β€Ί Connection queue β€Ί Other

OTHER Β· NGET

Thetford

Thetford is a 41 MW other project built and connected, connecting to the National Grid (England & Wales) network at Bramford 400kV Substation. The connection agreement is held by Epr Thetford Limited.

Project stageOperating
  1. Planning (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. Operating (current stage)
  5. Closed (not yet reached)

Connection details

NESO project number
PRO-000237
Customer
Epr Thetford Limited
Technology
Biomass
Total capacity
41 MW
Already connected
41 MW
Connection site
Bramford 400kV Substation
Transmission owner
National Grid (England & Wales)
Connection type
Embedded (connects through the local distribution network)
NESO project status
Built

Connection site

The marker shows the connection substation, not the project itself, with the transmission network around it.

Projects connecting near Bramford Β· Grid map

Other projects at Bramford 400kV Substation

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem