Grid infrastructure βΊ Connection queue βΊ Battery storage
BATTERY STORAGE Β· NGETBramford BESS
Bramford BESS is a 300 MW battery storage project consented, connecting to the National Grid (England & Wales) network at Bramford 400kV Substation, with capacity due from November 2029. The connection agreement is held by Cse33 Limited.
Project stageConsented
- Planning (completed)
- Consented (current stage)
- Construction (not yet reached)
- OperatingFrom Nov 2029 (not yet reached)
- Closed (not yet reached)
Connection details
- NESO project number
- PRO-002071
- Customer
- Cse33 Limited
- Technology
- Energy Storage System
- Total capacity
- 300 MW
- Change in this agreement
- +300 MW
- Capacity effective from
- 30 November 2029
- Connection site
- Bramford 400kV Substation
- Transmission owner
- National Grid (England & Wales)
- Connection type
- Direct connection to the transmission network
- NESO project status
- Consents Approved
Connection site
The marker shows the connection substation, not the project itself, with the transmission network around it.
Other projects at Bramford 400kV Substation
- Alcemi Bramford Battery Energy Storage FacilityBattery storage Β· 500 MW Β· Scoping
- ER BRF 2 EnergySolar + storage Β· 249 MW Β· Scoping
- Bramford (Tertiary)Solar + storage Β· 57 MW Β· Built
- Bramford 2 GEC (Ethos Green)Solar + storage Β· 57 MW Β· Awaiting Consents
- Bramford TertiarySolar + storage Β· 57 MW Β· Consents Approved
- Bramford TertiarySolar + storage Β· 50 MW Β· Consents Approved
- ThetfordOther Β· 41 MW Β· Built
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem