NESO TEC REGISTER · GREAT BRITAIN

Grid connection projects in the connection queue

Every generator, battery and interconnector with an agreement to connect to the GB transmission network, from early scoping to built. Filter by technology, stage or network, and open a project for its connection details.

Projects shown1,590616.3 GW in total
In planning1,590scoping or awaiting consent
Consented or building265closest to connecting
Built400connected and operating

Map

Loading projects…

Voltage400 kV275 kV132 kVHVDCNew HVAC

ProjectsPlanningConsentedConstructionBuiltMajor project with its own page

Projects

1,590 projects · page 31 of 32
ProjectCapacityStageConnection siteFrom
Hare Craig Wind Farm
Onshore wind · Hare Craig Windfarm LLP
46 MWAwaiting Consents Hare Craig 33kV Substation
SP Transmission (south Scotland)
Oct 2028
Blaen y Glyn
Onshore wind · Banc Du Energy Park Limited
46 MWScoping Chirk GSP
National Grid (England & Wales)
Feb 2027
Callisterhall Wind Farm
Onshore wind · E Power Limited
46 MWScoping Callisterhall 132kV
SP Transmission (south Scotland)
Apr 2029
Claydon Solar B (A033)
Solar + storage · RWE Renewables UK Solar and Storage Limited
45 MWScoping Port Ham GSP
National Grid (England & Wales)
Apr 2025
Contullich BESS
Battery storage · Contullich Energy Storage Limited
45 MWScoping Alness 2 275/33 kV GSP Substation
SSEN Transmission (north Scotland)
Oct 2030
Daviot Windfarm BEGA
Wind + storage · Cubico UK Development Limited
45 MWScoping Inverness 132/33Kv Grid Supply Point Substation
SSEN Transmission (north Scotland)
Oct 2030
Giants Burn Wind Farm
Onshore wind · Gb Wind Farm Limited
44 MWScoping New Dunoon 132/33kV GSP Substation
SSEN Transmission (north Scotland)
May 2030
Balgray Wind Farm
Wind + storage · Fred Olsen Renewables Limited
43 MWScoping Dumfries North 400/132kV substation
National Grid (England & Wales)
Oct 2037
Cairnborrow Wind Energy Hub
Wind + storage · Bpuwl 29 Limited
43 MWScoping Cairnford GSP
SSEN Transmission (north Scotland)
Oct 2031
Frome Valley Energy Park
Solar + storage · Biosouth Energy Limited
43 MWScoping Chickerell-Mannington 400kV Substation
National Grid (England & Wales)
Oct 2039
Melvich Wind Energy Hub (BEGA)
Wind + storage · Melvich Wind Energy Hub Limited
43 MWAwaiting Consents Dounreay 2 275/33kV GSP Substation
SSEN Transmission (north Scotland)
Oct 2033
Novar 2 Wind Farm
Onshore wind · Headwind Development Services Limited
43 MWScoping Alness GSP
SSEN Transmission (north Scotland)
Oct 2032
Boreland BESS
Battery storage · Boreland Energy Ltd
43 MWScoping Killin GSP
SSEN Transmission (north Scotland)
Oct 2031
Cleveden Road BESS
Battery storage · Vital Energi Solutions Limited
43 MWScoping Killermont GSP
SP Transmission (south Scotland)
Jun 2031
Gladsmuir Wind Farm
Onshore wind · Wind Estate (UK) Limited
43 MWScoping Harburn 132/33kV Grid Supply Point Substation
SP Transmission (south Scotland)
Oct 2032
Craigneil Wind Farm
Onshore wind · Esb Asset Development UK Limited
42 MWScoping Fetteresso 132/33kV GSP Substation
SSEN Transmission (north Scotland)
Oct 2030
Dalmarnock Storage BESS
Battery storage · Viridisia Ltd
42 MWScoping Dalmarnock Storage BESS 132kV Substation
SP Transmission (south Scotland)
Apr 2030
GH DEVCO Kincardine BESS
Battery storage · Kincardine Storage Limited
42 MWScoping GH DEVCO KINCARDINE BESS 132kV SUBSTATION
SP Transmission (south Scotland)
Oct 2029
Glentaggart 42MW BESS
Battery storage · Glentaggart Wind Limited
42 MWScoping Glentaggart WF 33kV Substation
SP Transmission (south Scotland)
Oct 2027
Lamford Hill
Solar + storage · Benbrack Wind Farm Limited
42 MWScoping Benbrack Wind Farm 132/33kV Substation
SP Transmission (south Scotland)
Oct 2036
Gammidge PV & BESS Park
Battery storage · Cs UK Holdings III Limited
41 MWScoping Grendon 132kV Substation
National Grid (England & Wales)
Oct 2027
Coldstream Solar PV Plant
Solar · Conrad Energy (Developments) II Limited
41 MWScoping Eccles GSP
SP Transmission (south Scotland)
Jul 2031
014 NEP Bransholme
Battery storage · New Energy Partnership Limited
40 MWScoping North Humber Connection Node C 132kV Substation
National Grid (England & Wales)
Oct 2035
Carlisle Road
Battery storage · Mercia Power Response Limited
40 MWScoping Pitsmoor GSP
National Grid (England & Wales)
Oct 2033
Darnall Road
Battery storage · Mercia Power Response Limited
40 MWScoping West Melton GSP
National Grid (England & Wales)
Oct 2034
Gilbertfield Farm BESS
Battery storage · GPC 678 LTD
40 MWScoping Clydesmill GSP
SP Transmission (south Scotland)
Apr 2029
Glasgow Road 40MW BESS
Battery storage · GPC 1137 Ltd
40 MWScoping Giffnock 275/33kV
SP Transmission (south Scotland)
Oct 2028
Hareshaw Rig Wind Farm
Onshore wind · Hareshaw Rig Wf Limited
40 MWScoping Hopsrig Collector 132/33kV Substation
SP Transmission (south Scotland)
Oct 2029
Kennishead
Battery storage · Starlight Energy UK Limited
40 MWScoping Haggs Road GSP
SP Transmission (south Scotland)
Oct 2031
Meall Buidhe Wind Farm
Onshore wind · Muirden Energy LLP
40 MWScoping Shin 1 GSP
SSEN Transmission (north Scotland)
Oct 2032
Rowancraig Wind Farm
Onshore wind · Koehler Renewable Energy UK Limited
40 MWScoping Rowancraig Wind Farm 33Kv Substation
SP Transmission (south Scotland)
May 2030
Causeymire 2 Wind Farm
Onshore wind · Headwind Development Services Limited
40 MWScoping Mybster 4 132/33kV GSP Substation
SSEN Transmission (north Scotland)
Oct 2034
Glenmore
Onshore wind · Aeuk Wind Project II Ltd
40 MWScoping Edinbane 132/33kV Substation
SSEN Transmission (north Scotland)
Oct 2034
Tarbuckle Hill Wind Farm
Onshore wind · Energiekontor UK Ltd
40 MWScoping Cairnford GSP
SSEN Transmission (north Scotland)
Oct 2031
Middleton Farm Solar
Solar · Bluestone Middleton Farm 1 Ltd
39 MWScoping Elderslie 132/33kV
SP Transmission (south Scotland)
Jun 2028
Craigdow Hill Wind Farm
Onshore wind · Abei Energy Limited
38 MWScoping Maybole GSP
SP Transmission (south Scotland)
Oct 2032
Creag Dhubh
Onshore wind · Muirden Energy LLP
38 MWScoping Clachan 2 132/33kV GSP Substation
SSEN Transmission (north Scotland)
Oct 2030
Dorenell Battery
Onshore wind · Clashindarroch Windfarm Extension Limited
38 MWScoping Dorenell BESS 132KV substation
SSEN Transmission (north Scotland)
Oct 2023
Cairnmore Hill Wind Farm
Onshore wind · Cairnmore Hill Energy Limited
36 MWAwaiting Consents Thurso South GSP
SSEN Transmission (north Scotland)
May 2028
Cogle Moss Wind Farm
Onshore wind · Cogle Moss Renewables LLP
36 MWScoping Mybster 2 132/33kV Substation
SSEN Transmission (north Scotland)
Aug 2025
Craig Nab Wind Energy Hub
Wind + storage · Craig Nab Wind Energy Hub Limited
36 MWScoping Ladyburn 132kV Substation
SP Transmission (south Scotland)
Aug 2031
Glasvaar
Onshore wind · E Power Limited
36 MWScoping Craig Murrail GSP
SSEN Transmission (north Scotland)
Oct 2037
Loch Luichart Extension II
Onshore wind · Bluebell Wind Farm Limited
36 MWScoping Loch Luichart Extension II Substation
SSEN Transmission (north Scotland)
Oct 2024
South Brook
Solar + storage · JBM Solar Limited
36 MWAwaiting Consents Melksham 400kV Substation
National Grid (England & Wales)
Jun 2037
Wymondley BESS Limited
Battery storage · Agr Renewables Limited
36 MWAwaiting Consents Wymondley 400kV Substation
National Grid (England & Wales)
Oct 2034
Finlarig
Hydro and pumped storage · Sse Generation Limited
35 MWScoping Killin 132/11kV Substation
SSEN Transmission (north Scotland)
Nov 2031
Tale Lane Solar / A008 Langford
Solar + storage · Jbm Solar Projects 2 Ltd
35 MWScoping Exeter GSP
National Grid (England & Wales)
Apr 2025
Strath Tirry
Onshore wind · Strath Tirry Wind Energy 2021 Ltd
35 MWAwaiting Consents Lairg GSP
SSEN Transmission (north Scotland)
Dec 2029
Hawkwood Wind Farm
Onshore wind · Wilson Renewables IV LLP
34 MWScoping Hawkwood Windfarm 33kV Substation
SP Transmission (south Scotland)
Apr 2030
Lorg Extension Wind Farm
Onshore wind · RWE Renewables UK Onshore Wind Limited
33 MWScoping Lorg Extension Wind Farm 132/33kV Substation
SP Transmission (south Scotland)
Aug 2029
Page 31 of 32

Sources: NESO Transmission Entry Capacity (TEC) register and interconnector register (downloaded 8 November 2026); NESO Clean Power 2030 network map (existing and planned circuits, substations and network projects); National Grid Electricity Transmission overhead line routes. Contains data from NESO, licensed under the NESO Open Data Licence, and National Grid open data. Projects are placed at their connection substation, not the generating site; projects at new, unnamed “connection nodes” are listed but not mapped.