Grid infrastructure βΊ Connection queue βΊ Battery storage
BATTERY STORAGE Β· NGETDarnall Road
Darnall Road is a 40 MW battery storage project in planning, connecting to the National Grid (England & Wales) network at West Melton GSP, with capacity due from October 2034. The connection agreement is held by Mercia Power Response Limited.
- Planning (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingFrom Oct 2034 (not yet reached)
- Closed (not yet reached)
Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.
Connection details
- NESO project number
- PRO-003641
- Customer
- Mercia Power Response Limited
- Technology
- Energy Storage System
- Total capacity
- 40 MW
- Change in this agreement
- +40 MW
- Capacity effective from
- 30 October 2034
- Connection site
- West Melton GSP
- Transmission owner
- National Grid (England & Wales)
- Connection type
- Embedded (connects through the local distribution network)
- NESO project status
- Scoping
Connection site
The marker shows the connection substation, not the project itself, with the transmission network around it.
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem