Grid infrastructure βΊ Connection queue βΊ Onshore wind
ONSHORE WIND Β· SPTCraigdow Hill Wind Farm
Craigdow Hill Wind Farm is a 38 MW onshore wind project in planning, connecting to the SP Transmission (south Scotland) network at Maybole GSP, with capacity due from October 2032. The connection agreement is held by Abei Energy Limited.
- Planning (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingFrom Oct 2032 (not yet reached)
- Closed (not yet reached)
Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.
Connection details
- NESO project number
- PRO-006036
- Customer
- Abei Energy Limited
- Technology
- Wind Onshore
- Total capacity
- 38 MW
- Change in this agreement
- +38 MW
- Capacity effective from
- 31 October 2032
- Connection site
- Maybole GSP
- Transmission owner
- SP Transmission (south Scotland)
- Connection type
- Embedded (connects through the local distribution network)
- NESO project status
- Scoping
- Connections reform gate
- Gate 1
Connection site
The marker shows the connection substation, not the project itself, with the transmission network around it.
Other projects at Maybole GSP
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem