🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

Grid infrastructure › Connection queue › Onshore wind

ONSHORE WIND · SPT

Lorg Extension Wind Farm

Lorg Extension Wind Farm is a 33 MW onshore wind project in planning, connecting to the SP Transmission (south Scotland) network at Lorg Extension Wind Farm 132/33kV Substation, with capacity due from August 2029. The connection agreement is held by RWE Renewables UK Onshore Wind Limited.

Project stageIn planning
  1. Planning (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingFrom Aug 2029 (not yet reached)
  5. Closed (not yet reached)

Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.

Connection details

NESO project number
PRO-002430
Customer
RWE Renewables UK Onshore Wind Limited
Technology
Wind Onshore
Total capacity
33 MW
Change in this agreement
+33 MW
Capacity effective from
13 August 2029
Connection site
Lorg Extension Wind Farm 132/33kV Substation
Transmission owner
SP Transmission (south Scotland)
Connection type
Direct connection to the transmission network
NESO project status
Scoping
Connections reform gate
Gate 1

Connection site

The connection site could not be placed on the map.

Projects connecting near Lorg Extension Wind Farm · Grid map

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem