NESO TEC REGISTER · GREAT BRITAIN

Grid connection projects in the connection queue

Every generator, battery and interconnector with an agreement to connect to the GB transmission network, from early scoping to built. Filter by technology, stage or network, and open a project for its connection details.

Projects shown2,255782.1 GW in total
In planning1,590scoping or awaiting consent
Consented or building265closest to connecting
Built400connected and operating

Map

Loading projects…

Voltage400 kV275 kV132 kVHVDCNew HVAC

ProjectsPlanningConsentedConstructionBuiltMajor project with its own page

Projects

2,255 projects · page 30 of 46
ProjectCapacityStageConnection siteFrom
Taunton
Battery storage · Pivoted Power LLP
100 MWAwaiting Consents Taunton 400kV Substation
National Grid (England & Wales)
Oct 2037
Thurso South BESS
Battery storage · WP Grid Storage 3 Limited
100 MWScoping Thurso South 275kV Substation
SSEN Transmission (north Scotland)
Oct 2030
Walpole 2 (tertiary)
Solar + storage · Enso Green Holdings R Limited
100 MWConsents Approved Walpole 132kV Substation
National Grid (England & Wales)
Oct 2027
West Botley High Impact Green Energy Hub
Solar + storage · Telis Energy UK Limited
100 MWScoping Botley West 400kV Substation
National Grid (England & Wales)
Oct 2037
West Common Ipers Lane
Battery storage · West Common BESS Limited
100 MWScoping Solent Connection Node A 132kV Substation
National Grid (England & Wales)
Oct 2038
Woodheads Energy Park
Solar + storage · Abo Energy United Kingdom Ltd
100 MWScoping Gala North 400/132kV Substation
SP Transmission (south Scotland)
Apr 2033
KXP Alpha One
Battery storage · Kxp Alpha I Limited
100 MWScoping Fawley 132kV Substation
National Grid (England & Wales)
Oct 2036
KXP Alpha Three
Battery storage · Kxp Alpha III Limited
100 MWScoping Fawley 132kV Substation
National Grid (England & Wales)
Oct 2036
KXP Alpha Two
Battery storage · Kxp Alpha II Limited
100 MWScoping Fawley 132kV Substation
National Grid (England & Wales)
Oct 2036
Thornton Facility
Solar + storage · Balwen Limited
100 MWBuilt Thornton 400kV Substation
National Grid (England & Wales)
Barge Way 120MW BESS
Battery storage · Fpc Electric Land Limited
100 MWScoping Kemsley GSP
National Grid (England & Wales)
Oct 2033
Barking BESS
Battery storage · O&G Solar (SPV 52) Limited
100 MWConsents Approved Barking West GSP
National Grid (England & Wales)
Oct 2028
Didcot BESS 2
Battery storage · Downing Renewable Developments LLP
100 MWScoping Didcot 132kV GIS Substation
National Grid (England & Wales)
Oct 2037
Elland BESS
Battery storage · O&G Solar (SPV 39) Limited
100 MWScoping Elland 132kV Substation
National Grid (England & Wales)
Oct 2036
Ferrybridge B BESS & Solar Substation
Solar + storage · O&G Solar (SPV 19) Limited
100 MWConsents Approved Ferrybridge B 132kV Substation
National Grid (England & Wales)
Oct 2035
Forsa Energy Denny BESS
Battery storage · Forsa Energy Holdings Limited
100 MWScoping Forsa Energy Denny BESS 132Kv Grid Supply Point Substation
SP Transmission (south Scotland)
Oct 2030
Glendoe
Hydro and pumped storage · Sse Generation Limited
100 MWBuilt Fort Augustus GSP
SSEN Transmission (north Scotland)
Gunfleet Sands Offshore Wind Farm
Offshore wind · Gunfleet Sands Limited
100 MWBuilt Gunfleet Sands 33/132kV Offshore
National Grid (England & Wales)
Hadyard Hill
Onshore wind · Sse Renewables Wind Farms (UK) Limited
100 MWBuilt Maybole 132/33kV
SP Transmission (south Scotland)
High Marnham Solar Farm
Solar · Anesco Limited
100 MWScoping High Marnham 400kV Substation
National Grid (England & Wales)
Oct 2031
Hill House Farm Solar and Storage
Solar + storage · Bsr Applications Limited
100 MWScoping Norton GSP
National Grid (England & Wales)
Oct 2035
J102A Oldbury BESS
Battery storage · RWE Renewables UK Solar and Storage Limited
100 MWScoping Severn Connection Node A 132kV Substation
National Grid (England & Wales)
Oct 2037
KX Alpha 3 Iron Acton
Battery storage · Kxp Alpha III Limited
100 MWScoping Severn Connection Node A 400kv Substation
National Grid (England & Wales)
Oct 2037
KXP Alpha 1 Little Horsted
Battery storage · Kxp Alpha I Limited
100 MWScoping Sussex and Romney Connection Node A 400kV Substation
National Grid (England & Wales)
Oct 2037
KXP Alpha 2 Little Horsted
Battery storage · Kxp Alpha II Limited
100 MWScoping Sussex and Romney Connection Node A 400kV Substation
National Grid (England & Wales)
Oct 2037
KXP Alpha 3 Little Horsted
Battery storage · Kxp Alpha III Limited
100 MWScoping Sussex and Romney Connection Node A 400kV Substation
National Grid (England & Wales)
Oct 2037
Lakeside Energy Drax
Battery storage · Lakeside Energy Storage Limited
100 MWBuilt Drax 132kV Substation
National Grid (England & Wales)
Mckraw99Mw BESS Bega
Battery storage · Care Power (Muckraw) Limited
100 MWScoping Muckraw IDNO GSP
SP Transmission (south Scotland)
Jun 2032
Norwich 100MW BESS
Battery storage · Flexion Energy Spv 2 Ltd
100 MWScoping Norwich Main 132kV
National Grid (England & Wales)
Oct 2031
Pembroke BESS and Solar Station
Solar + storage · Renesola Hercules Energy 1 Limited
100 MWAwaiting Consents Pembroke 400kV Substation
National Grid (England & Wales)
Oct 2028
Penn Renewable BESS & Substation
Solar + storage · O&G Solar (SPV 30) Limited
100 MWScoping Penn 132kV Substation
National Grid (England & Wales)
Oct 2034
Shaftesbury Energy Park
Battery storage · Tagenergy Development UK Limited
100 MWConsents Approved Shaftesbury 132kV Substation
National Grid (England & Wales)
Dec 2036
Thurcroft BESS
Battery storage · Harmony Tc Limited
100 MWScoping Thurcroft 275kV Substation
National Grid (England & Wales)
Oct 2031
Valley Farm
Battery storage · Starlight Energy UK Limited
100 MWScoping Bishops Wood GSP
National Grid (England & Wales)
Oct 2037
Breakish Windfarm
Onshore wind · Asuk Holdco 2 Limited
100 MWScoping Breakish 132kV Substation
SSEN Transmission (north Scotland)
Apr 2034
Dollymans Storage
Battery storage · Dollymans Storage Limited
100 MWScoping Rayleigh Main 132kV Substation
National Grid (England & Wales)
Jan 2023
Danks Way BESS
Battery storage · Ocker Hill BESS Limited
99 MWUnder Construction/Commissioning Ocker Hill C 132kV GSP
National Grid (England & Wales)
Oct 2026
Iron Acton
Solar + storage · Iron Acton Green Limited
99 MWBuilt 132kV bay at Iron Acton Substation
National Grid (England & Wales)
AGS Inverclyde BESS
Battery storage · Slate Island Developments Limited
99 MWScoping Braeside IDNO 132/33kV substation
SP Transmission (south Scotland)
Oct 2031
Blair Hill Wind Farm
Onshore wind · Renewable Energy Systems Limited
99 MWScoping Blair Hill Wind Farm 132Kv Substation
SP Transmission (south Scotland)
Oct 2036
Brigg
Gas · Cbs Energy Storage Assets UK Limited
99 MWBuilt Keadby 400kV Substation
National Grid (England & Wales)
Brunt Hill Wind Farm
Wind + storage · Brunt Hill Limited
99 MWAwaiting Consents Westfield 132/33kV
SSEN Transmission (north Scotland)
Oct 2031
Car Duibh Wind Farm
Onshore wind · Car Duibh Wind Farm Limited
99 MWAwaiting Consents Car Duibh 275kV Substation
SSEN Transmission (north Scotland)
Oct 2034
Elchies Wind Farm
Onshore wind · Elchies Wind Limited
99 MWScoping Elchies 132/33kV Substation
SSEN Transmission (north Scotland)
Nov 2028
Fort Dunlop
Gas · Whitetower Energy Limited
99 MWBuilt Dunlop 132kV Substation
National Grid (England & Wales)
Forsinain Wind Farm
Onshore wind · Forsinain Forest Wind Farm Limited
99 MWScoping Connagill 132kV Substation
SSEN Transmission (north Scotland)
Oct 2037
KX Alpha 1 Iron Acton
Battery storage · Kxp Alpha I Limited
99 MWScoping Severn Connection Node A 400kv Substation
National Grid (England & Wales)
Oct 2037
KX Alpha 2 Iron Acton
Battery storage · Kxp Alpha II Limited
99 MWScoping Severn Connection Node A 400kv Substation
National Grid (England & Wales)
Oct 2038
Kxp Alpha 3 Ayr BESS
Battery storage · Kxp Alpha III Limited
99 MWScoping KXP Alpha 3 Ayr BESS 275kV Substation
SP Transmission (south Scotland)
Oct 2037
Loch Liath Wind Farm
Onshore wind · Loch Liath Wind Farm Limited
99 MWAwaiting Consents Loch Liath 132/33kV Substation
SSEN Transmission (north Scotland)
Oct 2035
Page 30 of 46

Sources: NESO Transmission Entry Capacity (TEC) register and interconnector register (downloaded 8 November 2026); NESO Clean Power 2030 network map (existing and planned circuits, substations and network projects); National Grid Electricity Transmission overhead line routes. Contains data from NESO, licensed under the NESO Open Data Licence, and National Grid open data. Projects are placed at their connection substation, not the generating site; projects at new, unnamed “connection nodes” are listed but not mapped.