Loch Liath Wind Farm

Loch Liath Wind Farm is a 99 MW onshore wind project in planning, connecting to the SSEN Transmission (north Scotland) network at Loch Liath 132/33kV Substation, with capacity due from October 2035. The connection agreement is held by Loch Liath Wind Farm Limited.

Project stageIn planning
  1. Planning (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingFrom Oct 2035 (not yet reached)
  5. Closed (not yet reached)

Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.

Connection details

NESO project number
PRO-001671
Customer
Loch Liath Wind Farm Limited
Technology
Wind Onshore
Total capacity
99 MW
Change in this agreement
+99 MW
Capacity effective from
31 October 2035
Connection site
Loch Liath 132/33kV Substation
Transmission owner
SSEN Transmission (north Scotland)
Connection type
Direct connection to the transmission network
NESO project status
Awaiting Consents
Connections reform gate
Gate 1

Connection site

The connection site could not be placed on the map.

Projects connecting near Loch Liath · Grid map

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem